Download Inhoudsopgave Inhoud Print deze pagina

Spare Parts Lists - SPECK Pumpen BADU Bronze Vertaling Van De Oorspronkelijke Gebruiksaanwijzing

Normaal en zelfaanzuigende met/zonder uitvoering met kunststof lantaarn
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 123
Faults
4.
Wait until the built-in overload switch automatically switches
the motor on after it has cooled down.
– or –
Reset the motor overload switch.
5.
As soon as full motor speed is reached, open the valve on
the delivery side completely.
6.
Have an electrician test the power supply, fuses and power
consumption.
7.
If the built-in or external overload switch switches the motor
off again, notify Customer Services.
7.1.2

Spare parts lists

Spare parts lists for each pump can be found on the website
www.speck-pumps.com.
26 EN
06|2021

Advertenties

Inhoudsopgave
loading

Inhoudsopgave