Download Inhoudsopgave Inhoud Print deze pagina

Spa Pump Equipotential Bonding Terminal - Bestway Lay-Z-Spa Handleiding

Verberg thumbnails Zie ook voor LAY-Z-SPA:
Inhoudsopgave
Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 133
PRCD TEST

SPA PUMP EQUIPOTENTIAL BONDING TERMINAL

It is recommended to arrange for a qualified electrician to connect
the spa pump to an equipotential bonding terminal using a
minimum 2.5mm
When inflating, you will notice that air will be expelled
from the area where the air hose connects to the
pump, this is normal for technique requirements.
Important: Don't cover the holes on the base of the
inflation hose. This operation will over inflate the liner
and damage the structure.
Do not use an air compressor to inflate the pool.
Do not drag the pool on rough ground as this may cause damage to the pool liner.
Inflation time for reference only.
TEST
RESET
TEST
RESET
2
solid copper conductor.
1
3
18
TEST
RESET
TEST
RESET
2
4
Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Maldives hydrojet pro s200102Hawaii hydrojet pro s2001026003360031

Inhoudsopgave