Download Inhoudsopgave Inhoud Print deze pagina

Delivery Scope And Transport Inspection; Unpacking; Disposal Of The Packaging; Setup Location Requirements - CASO DESIGN UZ 400 Handleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 83

13.2 Delivery scope and transport inspection

As a rule, the UZ 400 is delivered with the following components:
 UZ 400
 Lid
 Quadruple blades with protection caps
Please note
► Examine the shipment for its completeness and for any visible damages.
► Immediately notify the carrier, the insurance and the supplier about any incomplete
shipment or damages as a result of inadequate packaging or due to transportation.

13.3 Unpacking

To unpack the device, proceed as follows:
 Remove the device out of the carton and remove the packaging material.

13.4 Disposal of the packaging

The packaging protects the device against damages during transit. The packaging
materials are selected in accordance with environmentally compatible and recycling-
related points of view and can therefore be recycled.
Returning the packaging back to the material loop saves raw materials and reduces the
quantities of accumulated waste. Take any packaging materials that are no longer required
to "Green Dot" recycling collection points for disposal.
Please note
► If possible, keep the original packaging for the device for the duration of the guarantee
period of the device, in order that the device can be re-packaged properly in the event
of a guarantee claim.

13.5 Setup location requirements:

In order to ensure the safe and trouble-free operation of the device, the setup location
must fulfil the following prerequisites:
 Place the device on a firm and even work surface.
 Do not use the device outdoors.
 Choose the setup location in such a way that children cannot reach the device.
 The device is not intended to be installed in a wall or a built-in cupboard.
Do not set up the device in a hot, wet or extremely damp environment or near
flammable material.
 The installation and assembly of this device in non-stationary setup locations (e.g. on
ships) must be carried out by specialist companies / electricians, provided they
guarantee the prerequisites for the safe use of this device.
 Glass bowl
 Antislip-ring
 Operating Instructions
30

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

1748

Inhoudsopgave