Download Inhoudsopgave Inhoud Print deze pagina

Heating Priority Wiring For Monophasic Pump - Hayward FULL INVERTER HP5091DT3H Installatie- En Bedieningshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 194
6. APPENDIX (continued)

6.2 Heating priority wiring for monophasic pump

Dry contact 7 A max
K2
Power supply
230V
/ 50Hz
Monophasic pump
Terminals 1 and 2 deliver a potential-free dry contact,
230V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
26

Advertenties

Inhoudsopgave
loading

Inhoudsopgave