Download Inhoudsopgave Inhoud Print deze pagina

Connection Drawing, Clamp Description; Mains Connection; Start-Up; General - Biral CompAX BLUE Series Originele Montage- En Bedrijfshandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 93
5.4

Connection drawing, clamp description

6

Start-up

6.1

General

Before start-up, it is vital that the unit is filled with the delivery medium and ventilated. Close to the
inlet nozzles of the pump, it should also be the required minimum intake pressure. The system
Änd.Index
Datum
Visum
I
III
can be ventilated via the pump. The pump itself is self-ventilating.
PrimAX 32-x 180
II
Biral Connector montieren
für BA
6.2
III

Operational control

I
Biral AG
After switching on the power supply the pump must start up independently: the Biral impeller turns
II
CH-3110 Münsingen
and flashes green.
I
Watt and Error
IL00006045_00
3 - 45
See section 7.5 Status display and Watt display
V
25% 50% 75% 100%
V
H
H
III
II
I
III
V
II
V
L N
AC in
~1x230 V
50/60 Hz
Ersetzt durch:
III
Massstab
II
I
Zeichnungsnummer
961934
LED
Status display
OFF
V
25% 50% 75% 100%
III
II
I
V

Mains connection:

1x230V +/- 10%, 50/60Hz
Terminals:
L, N, PE Mains connection
10%
±
Ersatz für:
gezeichnet 13.05.2015
ts
geprüft
11.09.2015
ts
Freigabe
11.09.2015
ts
PDM_Nr
TD-0030167
Änd.Index
00
Status
Pump running
83
english
|

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Compax blue rv/kh series

Inhoudsopgave