TECHNICAL DATA

EU Product Fiche

Data determined according to:
standard EN61591 and Commission Regulations (EU) No 65/2014 and (EU) No 66/2014.
Trade mark
Type of model
Annual Energy Consumption (AEC
Energy Efficiency Class
Fluid Dynamic Efficiency (FDE
Fluid Dynamic Efficiency class
Lighting Efficiency (LE
Lighting Efficiency class
Grease Filtering Efficiency
Grease Filtering Efficiency class
Air flow at minimum and maximum speed in normal use
Air flow at intensive or boost setting
Airborne acoustical A-weighted sound power emissions at minimum and
maximum speed in normal use
Airborne acoustical A-weighted sound power emissions at intensive or boost
setting
Power consumption off mode (P
Power consumption in standby mode (P

EU Product Data

Type of hood
Time increase factor (f)
Energy Efficiency Index (EEI
Measured air flow rate at best efficiency point (Q
Measured air pressure at best efficiency point (P
Measured electric power input at best efficiency point (W
Nominal power of the lighting system (W
Average illumination of the lighting system on the cooking surface (E
)
hood
)
hood
)
hood
)
o
)
s
)
hood
)
L
)
BEP
)
BEP
)
BEP
middle
ATAG
ES9011EVM
19,8 kWh/a
A
++
34,8
A
144
A
95,1
A
286 / 352 m
/h
3
482 m
/h
3
54 / 57 dB
65 dB
0,45 W
0,45 W
Island
0,7
34,8
215,7 m
/h
3
267,2 Pa
77,4 W
2 W
)
259 lux
EN 13