Download Inhoudsopgave Inhoud Print deze pagina

Environmental Aspects; Disposal Of Packaging And Appliance - Atag ES9011EVM Handleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

ENVIRONMENTAL ASPECTS

Disposal of packaging and appliance

Sustainable materials have been used during manufacture of this appliance. This appliance
must be disposed of responsibly at the end of its service life. Ask your local authorities for more
information about how to do this.
The appliance packaging is recyclable. The following materials may have been used:
cardboard;
polyethylene film (PE);
CFC-free polystyrene (PS rigid foam).
Dispose of these materials in a responsible manner and in accordance with government
regulations.
The product has been marked with a crossed-out dustbin symbol
to remind you of the obligation to dispose of electrical household
appliances separately. This means that the appliance may not be
included with normal domestic refuse at the end of its service life.
The appliance must be taken to a special municipal centre for
separated waste collection or to a dealer providing this service.
Separate collection of household appliances helps to prevent any
potential negative impact on the environment and on human health
caused by improper disposal. It ensures that the materials of which
the appliance is composed can be recovered to obtain significant
savings in energy and raw materials.
Declaration of Conformity
We hereby declare that our products satisfy the applicable European
Directives, Orders and Regulations, as well as the requirements stated
in the referenced standards.
EN 15

Advertenties

Inhoudsopgave
loading

Inhoudsopgave