Download Inhoudsopgave Inhoud Print deze pagina

Your Cooker Hood; Introduction - Atag Es9011Evm Handleiding

Inhoudsopgave
Beschikbare talen

Beschikbare talen

YOUR COOKER HOOD

Introduction

Congratulations on your choice of this Atag cooker hood. This product was designed with simple
operation and optimum comfort in mind.
This manual describes the best way to use this cooker hood. In addition to information on
operation, you will also find background information that may come in handy when using the
appliance.
Please read the separate safety instructions carefully before
using the appliance!
Attention: this cooker hood is equipped with a grease
collector instead of a grease filter!
Read this manual before using the appliance and keep it in a safe place for future use.
Installation instructions are supplied separately.
EN 4
Inhoudsopgave
loading

Inhoudsopgave