Download Inhoudsopgave Inhoud Print deze pagina

Inspection Of The Installation - Nibe VPB 500 Gebruikers- En Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

Improper disposal of the product by the user results in
administrative penalties in accordance with current le-

INSPECTION OF THE INSTALLATION

Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
Description
Hot water
(page
21)
Shut off valves
Mixing valve
Cold water
(page
21)
Shut off valves
Non-return valve
Safety valve
Electricity (page 22)
Connected supply
Sensors
El. anode (only VPB 500 E, 750
E, 1000 E)
Temperature limiter
16
gislation.
Notes
Signa-
Date
ture
VPB 500, VPB 750, VPB 1000 | GB

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Vpb 750Vpb 1000

Inhoudsopgave