Commissioning
Commissioning protocol
Commissioning Protocol R3400/R3500/R3600SB
Project
Boiler type
Serial number
Year
Nominal load (Hi)
Nominal output (Hi)
System
Water pressure
Water pH
Water hardness
Water chloride
Water ∆T full load
Water ∆p
boiler
Water flow
Pump setting
Safety devices
High limit setting
Temp. limiter setting
Min. gas pressure switch setting
Ignition time burner
Combustion analysis
Gas consumption
Gas pressure
CO
pilot burner
2
O
pilot burner
2
CO pilot burner
NOx pilot burner
CO
main burner
2
O
main burner
2
CO main burner
NOx main burner
T
atmospheric
T
fluegas
T
water, flow
T
water, return
Ionisation current
p
fan
p
top panel
p
combustion chamber
Parameter settings
P1 Setpoint temperature heating
P2 Setpoint temperature DHW
P11 Maximum boiler setpoint
Remarks
All manuals and user guides at all-guides.com
[kW]
[kW]
[bar]
[-]
[dºH]
[mg/l]
[ºC]
[kPa]
3
[m
/h]
[-]
[ºC]
[ºC]
[mbar]
[sec]
100% load
3
[m
/h]
[mbar]
[%]
[%]
[ppm]
[ppm]
[%]
[%]
[ppm]
[ppm]
[ºC]
[ºC]
[ºC]
[ºC]
[µA]
[mbar]
[mbar]
[mbar]
[ºC]
[ºC]
[ºC]
Project
Address
City
Date
Engineer
Installati-
Roof top
on:
Ground floor
Basement
Other: .........................
Hydrau-
Low velocity header
lics:
Plated heat exchanger
Bypass boiler
Other: .........................
Water flow sensor checked
Water flow switch checked
50% load
3
[m
/h]
[mbar]
[%]
[%]
[ppm]
[ppm]
[%]
[%]
[ppm]
[ppm]
[ºC]
[ºC]
[ºC]
[ºC]
[µA]
[mbar]
[mbar]
[mbar]
P12 Boiler hysteresis
P17 Fan speed min. load
P19 Fan speed 100% load
Min. load
3
[m
/h]
[mbar]
[%]
[%]
[ppm]
[ppm]
[%]
[%]
[ppm]
[ppm]
[ºC]
[ºC]
[ºC]
[ºC]
[µA]
[mbar]
[mbar]
[mbar]
[ºC]
[%]
[%]
31