Download Print deze pagina

VEVOR YCS-90 Handleiding pagina 6

Stoomgenerator
2.2. Installation of Control Panel and Connection cable
Figure 2 Installation of TC-01 Control panel
Figure 3 YCS steam generator
Plug the connection cable's pluginto the matching socket on Steam Generator
(Figure 3 ).Tear the sticker from the Panel's back,stick the Panel on the wall,and
seal the Panel's edge on the wall with silica gel.
2.3. Wiring
Wire through the right hole in the wall.Do properly protect the wire when going
through the wall.Be careful of extreme bending, sharp wooden fibers and nails.If
necessary, the wire can go through a pipe for renewal.
2.4.Operating an Testing Generator and Control Panel
After installation of piping system and circuitry,turn on the water valve and power
switch.Slightly touching the POWER button.After arriving the preset time,Steam
Generator stops working automatically, and the light turns off.
Operation without water is prohibited!
3.0 Installation of Steam Generator and Piping System
ALL machines manufactured in our factory have been rightly assembled and
5
loading