2.Don't install Generator outdoors/in humidity/in hot places/where it is easy to get
frozen or rotted/ near paints,thinner or petrol.During operation,be careful of
steam piping system and safety valve in case of being burnt.
3.Steam Generator must be vertically placed.
Installation of Piping System
Water Supplying Piping System and Steam Piping System must be installed
according to national standards and regulations before sealing the wall.
Figure 5 Installation of Steam Generator Piping System
1.The water inlet pipe,metal hose of 0.5 inch's diameter,connects Generator's
water inlet and water supplying system's valve.(Figure 5 )
2.The diameter of steam outlet copper pipe should be no less than 0.5inch.
(Black metal pipe or galvanized pipe is prohibited to use in case of rusting and
dirtying the wall.)The steam pipe should be no more than 3 meters long.If it is more
than 3 meters,some special works for heat preservation should be done.(Figure 5 )
3.The draining pipe should be connected to a pipe whose diameter is no less than
3 inches in case of damaging Steam Room during draining.
7