EN
shall be carried out prior to returning the compressor to the suppliers. Only
electric heating to the compressor body shall be employed to accelerate
this process. When oil drained form a system, it shall be carried out safely.
9. Fuses
The fuses below are mounted on the PWB.
FUSE 1: Walter 2010; AC 250V; T: 2A
FUSE: Walter 2010; AC 250V; T: 3.15A or 5A