INSTALLATION MUST BE PERFORMED BY A SPECIALIST.
BEFORE INSTALLING AN EZA POWER PACK, CHECK THE FUNCTIONING OF
THE ORIGINAL LEISURE BATTERY SYSTEM.
ASSESS THE CONDITION OF THE ELECTRICAL WIRING.
LOCATION OF ALTERNATOR - BATTERIES - ELECTRIC BOARD - D+ - SOLAR
IMPORTANT
CHECK:
THE ROUTING OF CONNECTIONS
PANEL, ETC.
Inspect the good
installation of the
EZA Power Pack