Download Inhoudsopgave Inhoud Print deze pagina

Connecting The D; After Installation And Before First Use - EZA EZA80V2 Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

6.5- Connecting the D+

Connect an information cable which indicates the presence of the D+ to
connector no.10 of the EZA power pack (attention: do not confuse this with
the permanent + ).
WARNING :
• Do not connect to the +APC or Permanent+
• Verify EZA is well connected to D+ of the carrier (not to the D+
powered by the auxiliary battery) by disconnecting the black plug
which supply the electrical central.
6.5- Synchronisation of the EZA application
The EZA application is available for free download from the eza.fr website or
in Google Play Store. This application allows you to:
-
Check the EZA power pack is properly installed and working well.
-
Have an image of all the information necessary to use the V2 EZA
power pack. This information is transmitted instantly to the application.
• To best synchronise the EZA power pack with the EZA
application and for the application to work best, it is vital to
consult the directions for use provided for this purpose (in the
appendix).
The directions for use and the description of the synchronisation process for
the EZA App are located in the appendix of this installation guide.

7- After installation and before first use

• Check the functioning of the installation.
• An initial full charge is necessary to synchronise the EZA power
pack with the EZA application. This charge must reach a voltage
of 14.2V.
D+
50

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Eza130v2Eza130s

Inhoudsopgave