Download Print deze pagina

Honeywell RABO Gebruiksaanwijzing pagina 24

Rotorgasmeters
Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 166
Honeywell
3.7 Commissioning/Filling with oil
CAUTION!
Oil lubrication: the meter must be filled with oil before
commissioning.
Permanent lubrication: the MF version does not need any
lubrication.
Horizontal installation
Fig. 12 | Installation, maintenance and inspection positions
1
Oil filler neck
Oil-level gauge glass or oil-level inspection plug/borehole for initial inspection
2
3a
Oil drain sleeve (horizontal)
Meter size
RABO-CT/CF
G10 to G40
G16 to G100
G160 to G400
G16 to G400
G16/G25
Measuring range
1:100
-25°C to +70°C
Table 4 | Oil types and quantities
24
1
2
3b
3a
3b
Oil drain sleeve (vertical)
Flow direction
horizontal
vertical
Horizontal
Vertical
Horizontal
Vertical
Shell Morlina S2 BL 10
Molyduval Chemlube 315
73021678h
© Elster GmbH | All rights reserved. Subject to modification
Vertical installation
Filling quantity
Oil type
[ml]
15
55
25
100
50
185
loading

Deze handleiding is ook geschikt voor:

Rabo g16Rabo g400Rabo ct g10Rabo ct g40Rabo cf g10Rabo cf g40